Home           Contact us           FAQs           
 
   Journal Page   |   Aims & Scope   |   Author Guideline   |   Editorial Board   |   Search
    Abstract
2011 (Vol. 3, Issue: 11)
Article Information:

Is It Possible to Ignore Problems Rising During Vertical Drilling? A Review

Saleem Qadir Tunio, Abdul Haque Tunio, Naveed Ahmed Ghirano and Sonny Irawan
Corresponding Author:  Saleem Qadir Tunio 

Key words:  Drilling parameters, drilling problems, vertical drilling, well planning, , ,
Vol. 3 , (11): 1329-1334
Submitted Accepted Published
2011 September, 29 2011 October, 24 2011 November, 25
Abstract:

The drilling process in petroleum industry is directly proportional with economics and if even a small problems encounters on any point during drilling will might results a commercial loss (i.e. economics and time factor). This study is based on the study of all those hindrances/problems often encounters during vertical drilling and ways to combat against those problems. Now, these days although the drilling have been an advanced practice but the problems are still of same nature like (bore-hole instability, loss-circulation, drill pipe sticking, gas cuts in a shallow formation, salt dome, kick and back flow). This study focuses above problems which are not natural but it is due to human error or may be the improper handling of the tool during the operation but these are critical with reference to the time factor and also budgeting is there. So, if these occur then the possible remedial actions in order to save the time factor as well as the economics are kept and handled accordingly. This may involve, the proper design of drilling components regarding given geophysical data of formation, proper usage of drilling fluid to avoid bit balling, formation sloughing, maintaining hydrostatic pressure and proper usage of blow out preventor to control abnormal pressures, so that a good drilling performance will be taken into account by setting up a benchmarking process that is termed to be as a necessity for survival.
Abstract PDF HTML
  Cite this Reference:
Saleem Qadir Tunio, Abdul Haque Tunio, Naveed Ahmed Ghirano and Sonny Irawan, 2011. Is It Possible to Ignore Problems Rising During Vertical Drilling? A Review.  Research Journal of Applied Sciences, Engineering and Technology, 3(11): 1329-1334.
    Advertise with us
 
ISSN (Online):  2040-7467
ISSN (Print):   2040-7459
Submit Manuscript
   Current Information
   Sales & Services
   Contact Information
  Executive Managing Editor
  Email: admin@maxwellsci.com
  Publishing Editor
  Email: support@maxwellsci.com
  Account Manager
  Email: faisalm@maxwellsci.com
  Journal Editor
  Email: admin@maxwellsci.com
  Press Department
  Email: press@maxwellsci.com
Home  |  Contact us  |  About us  |  Privacy Policy
Copyright © 2009. MAXWELL Science Publication, a division of MAXWELLl Scientific Organization. All rights reserved