Modeling Causes of Cost Overrun in Large Construction Projects with Partial Least Square-SEM Approach: Contractor's Perspective

Ismail Abdul Rahman, Aftab Hameed Memon, Ade Asmi Abdul Azis and Nor Hazana Abdullah
Corresponding Author:  Aftab Hameed Memon 

Key words:  Construction cost, cost overrun causes, large projects, Malaysia, PLS-SEM, structural equation modeling ,
Vol. 5 , (06): 1963-1972
Submitted Accepted Published
July 13, 2012 August 28, 2012 February 21, 2013
Abstract:

Construction cost overrun is a major problem faced by the construction industry globally and it needs serious attention to alleviate. Cost overrun is a result of one or combination of several causes which are very important to identify for effective cost performance. Current methodologies focusing on the identification of causes does not give the insight of underlying relationships between the causes. Hence, this study focused on studying the fundamental relationship between factors of cost overrun using Partial Least Square-SEM method. This is an advanced multivariate analysis technique for estimating and analyzing causal relationships in path models. Data collection was carried out with structured questionnaire survey amongst contractors involving in large construction projects in Malaysia. Hierarchal model for assessing causative factors and cost overrun was developed and analyzed using Smart PLS software of SEM and it was found that contractor’s site management related factors had strong effect on cost overrun. The calculated Global Fit (GoF) Index of model was 0.405, which indicates that the developed model had substantial explaining power to represent the Malaysia construction industry focused of large construction projects. Hence, improvement in contractor’s site management is the critical requirement to control construction cost overrun.
Abstract PDF HTML
  Cite this Reference:
Ismail Abdul Rahman, Aftab Hameed Memon, Ade Asmi Abdul Azis and Nor Hazana Abdullah, 2013. Modeling Causes of Cost Overrun in Large Construction Projects with Partial Least Square-SEM Approach: Contractor's Perspective.  Research Journal of Applied Sciences, Engineering and Technology, 5(06): 1963-1972.
    Advertise with us
 
ISSN (Online):  2040-7467
ISSN (Print):   2040-7459
Submit Manuscript
   Current Information
   Sales & Services
   Contact Information
  Executive Managing Editor
  Email: admin@maxwellsci.com
  Publishing Editor
  Email: support@maxwellsci.com
  Account Manager
  Email: faisalm@maxwellsci.com
  Journal Editor
  Email: admin@maxwellsci.com
  Press Department
  Email: press@maxwellsci.com
Home  |  Contact us  |  About us  |  Privacy Policy
Copyright © 2009. MAXWELL Science Publication, a division of MAXWELLl Scientific Organization. All rights reserved