Abstract
|
Article Information:
Investigation of FACTS Devices Performance on Decreasing of Lines Overload
Y. Hoseynpoor, T. PirzadehAshraf and Sh Sajedi
Corresponding Author: Y. Hoseynpoor
Submitted: 2011 July, 26
Accepted: 2011 September, 09
Published: 2011 November, 25 |
Abstract:
|
This study introduces the determination method of the optimum allocation of installing one or more
one of important FACTS devices named Thyristor Controlled Series Capacitor (TCSC). The target function to
determine the TCSCs installing place is reducing power system lines overload during fault contingency. After
determining TCSCs optimum installation place, their success rate in reducing lines overload is studied by a new
following index, transmitting index and it is presented that in oppose to our expectation, TCSCs do not have
a great roll in reducing lines overload during fault contingency. TCSC installation effect on amount of load
shedding reduction is also presented as a new subject to keep buses voltage stability. IEEE 14&30 bus power
systems are selected as the studied systems and mentioned analysis are applied on this system.
Key words: Fault contingency, lines overload, load shedding, TCSC allocation, thyristor controlled series capacitor (TCSC), ,
|
Abstract
|
PDF
|
HTML |
|
Cite this Reference:
Y. Hoseynpoor, T. PirzadehAshraf and Sh Sajedi, . Investigation of FACTS Devices Performance on Decreasing of Lines Overload. Research Journal of Applied Sciences, Engineering and Technology, (11): 1267-1271.
|
|
|
|
|
ISSN (Online): 2040-7467
ISSN (Print): 2040-7459 |
|
Information |
|
|
|
Sales & Services |
|
|
|