     Research Journal of Applied Sciences, Engineering and Technology


Statistical Evaluation for Communication Management in Iraqi Consultant Bureaus

1Faiq M. Al-zwainy, 2Firas K. Jaber and 3Atheer M. Tufiq
1Al-Nahrain University
2Northren Technical University
3University of Technology, Baghdad, Iraq
Research Journal of Applied Sciences, Engineering and Technology  2016  7:593-605
http://dx.doi.org/10.19026/rjaset.13.3019  |  © The Author(s) 2016
Received: May ‎29, ‎2016  |  Accepted: July ‎11, ‎2016  |  Published: October 05, 2016

Abstract

The purpose of this study is assess the reality of the communications management in Iraqi consultant bureaus, data collection completed by personal interview and questionnaires, then analysis questionnaire by using the Statistic Packages for Social Science, the results have shown in third section that is a lack of knowledge about the efficiency of the communication system in the consultant bureau , Finally, four section include communication barriers and individual in to three axis (technical communication barriers, financial communication barriers and communication barriers on worker performance) in consultant bureaus, the results of study sample agreed on the existence of communication barriers.

Keywords:

Arithmetic mean, consultant bureaus, communications management, evaluation, personal Interview, questionnaires,


References

  1. Al-Baldawe, A., 2007. Methods of Scientific Research and Statistical Analysis Plan for Research and Data Collection and Analysis Manually and Using SPSS Program. 3rd Edn., Al-Shoroq House for Publishing and Distribution, Oman. (In Arabic).
  2. Alfara, W., 2009. Data Analysis of Questionnaire by Use SPSS Program. 3rd Edn., National Library for Publication, Iraq. (In Arabic).
  3. Al-Jarjawi, Z., 2010. Methodological Rules for the Construction of the Questionnaire. 2nd Edn., Palestine House for Publishing, Palestine. (In Arabic).
  4. Al-Sumadia, A., 2013. Quintet Likert Scale and Descriptive Analysis of the Responses. 3rd Edn., Palestine House for Publishing, Palestine. (In Arabic).
  5. Al-Zwainy, F.M., 2009. The use of artificial neural net work for estimate total cost of highway construction projects. Ph.D. Thesis, Civil Engineering Department, Baghdad University.
  6. Al-Zwainy, F.M.S. and F.K. Jaber, 2014. Quality control of concrete board piles in overpasses projects in Iraq. Al-Taqani J., 27(4): 29-54.
  7. Al-Zwainy, F.M.S. and N.T. Hadhal, 2015. Investigation and evaluation of the cost estimation methods of Iraqi communication projects. Int. J. Eng. Manage. Res., 5(6): 41-48.
  8. Al-Zwainy, F.M.S. and N.T. Hadhal, 2016. Building a mathematical model for predicting the cost of the communication towers projects using multifactor linear regression technique. Int. J. Constr. Eng. Manage., 5(1): 25-29.
  9. Al-Zwainy, F.M.S., S.K. Abdulrahman and R.E. Kalil Zaki, 2013. Statistical evaluation of the affective factors on the process of preparing time schedules for Iraqi construction projects. J. Eng. Dev., 17(1): 33-61.
    Direct Link
  10. Al-Zwainy, F.M.S., A.M. Ibrahim and S.M. Duha, 2015a. Earned Value Management in Construction Project. LAP LAMBERT Academic Publishing, Germany.
  11. Al-Zwainy, F.M.S., I.A. Mohammed and S.H. Raheem, 2016. Investigation and assessment of the project management methodology in Iraqi construction sector. Int. J. Appl. Eng. Res., 11(4): 2494-2507.
  12. Fatma, S. and K. Marfit, 2002. Foundations and Principles of Scientific Research. 1st Edn., Alskandria Library for Publishing, Egyptian. (In Arabic).
  13. Merna, T. and F. Al-Thani, 2005. Corporate Risk Management. John Wiley & Sons Ltd., England.
  14. Mohammed, I.A., F.M. Sarhan and D. Sameer, 2014. Evaluation the performance of the infrastructure project using earned value management. Int. J. Civil Eng. Technol., 5(9): 145-155.
  15. Mousa, J.H.A., 2005. Risk management in construction projects from contractors and owners" perspective. M.Sc. Thesis, Faculty of Engineering, Islamic University of Gaza, Palestine.
  16. Rasool, S.H. and F.M.S. Al-Zwainy, 2016. Estimating productivity of brickwork item using logistic and multiple regression approaches. Sch. J. Eng. Technol., 4(5): 234-243.

Competing interests

The authors have no competing interests.

Open Access Policy

This article is distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution, and reproduction in any medium, provided you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license, and indicate if changes were made.

Copyright

The authors have no competing interests.

ISSN (Online):  2040-7467
ISSN (Print):   2040-7459
Submit Manuscript
   Information
   Sales & Services
Home   |  Contact us   |  About us   |  Privacy Policy
Copyright © 2024. MAXWELL Scientific Publication Corp., All rights reserved