Research Article | OPEN ACCESS
Investigation Cost Deviation of Highway Project
1Faiq M. Al-Zwainy and 2Reem Amer
1Civil Engineering Department, Al-Nahrain University
2Building and Construction Engineering Department, University of Technology, Baghdad, Iraq
Research Journal of Applied Sciences, Engineering and Technology 2016 11:843-855
Received: August 25, 2016 | Accepted: November 15, 2016 | Published: December 05, 2016
Abstract
Cost mangement of highway projects just as important as the other elements. This research involves on investigation the cost management status of the highway construction projects in Iraq. Survey includes investigate and evaluation the reality of cost planning and control and determine the causes of construction cost deviation. Causes of cost deviation has been investigated and collected by conducting the personal interviews and questionnaire with the sites engineers and by reviewing the previous literature. Questionnaire form was designed by following a simple method, because the questionnaire as an important source of acquiring field information and data. Iraqi Road and Bridge Directorate was selected as a sample study. It is worth to mention, that the statistical analysis has been conducted by using the SPSS program (version 20). Cost deviation reasons had classified into three groups by the researchers, which they planning reasons, designing reasons, execution reasons. Planning reasons classification had take a relative importance equal to 2.7, designing reasons classification had take a relative importance equal to 3 and execution reasons classification had take a relative importance equal to 2.45 according to this study.
Keywords:
Cost control, cost estimation, cost overrun , cost planning,
References
-
Al-Taee, M.R. and Z.M. Saco, 2009. Management and planning the cost in construction project. Eng. J., 15(4): 785-799.
-
Al-Zwainy, F.M., 2009. The use of artificial neural net work for estimate total cost of highway construction projects. Ph.D. Thesis, Civil Eng. Department, Baghdad University.
-
Al-Zwainy, F.M.S. and M.S.K. Al-Marsomi, 2016. Investigation and evaluation the performance of the construction residential complexes projects. Int. J. Appl. Eng. Res., 11(16): 8863-8877.
-
Al-Zwainy, F.M.S. and N.T. Hadhal, 2015. Investigation and evaluation of the cost estimation methods of Iraqi communication projects. Int. J. Eng. Manage. Res., 5(6): 41-48.
-
Al-Zwainy, F.M.S., S.K. Abdulrahman and R.E. Kalil Zaki, 2013. Statistical evaluation of the affective factors on the process of preparing time schedules for Iraqi construction projects. J. Eng. Dev., 17(1): 33-61.
Direct Link -
Al-Zwainy, F.M.S., R.H. Al-Suhaily and Z.M. Saco, 2015. Project Management and Artificial Neural Networks: Fundamental and Application. LAP LAMBERT Academic Publishing, German.
-
Al-Zwainy, F.M.S., I.A. Mohammed and S.H. Raheem, 2016. Investigation and assessment of the project management methodology in Iraqi construction sector. Int. J. Appl. Eng. Res., 11(4): 2494-2507.
-
Alzwainy, F., H.F. Ibraheem and A.A. Hadi, 2012. Modern techniques and methods in engineering education. J. Eng. Dev., 16(3): 1-16.
Direct Link -
Dalton, J.C., T.G. Edwards, J.E. Gott and M. McAndrew, 2011. Handbook: Construction Cost Estimating. 2nd Edn., Unified Facilities Criteria (UFC).
-
Dunn, L., M. Vass and J. Mitchell, 2015. Project Cost Estimating Manual. 6th Edn., Department of Transport and Main Roads, State of Queensland.
-
Majeed, A.O.A., 2013. Concepts of calendar, measurement and performance. Training Program Department, Training Collage, Saudi Arabia.
-
Potts, K.F., 2008. Construction Cost Management: Learning from Case Studies. 1st Edn., Taylor & Francis, London, New York.
Direct Link -
Project Management Institute, 2013. A Guide to the Project Management Body of Knowledge (PMBOK® guide). 5th Edn., Project Management Institute Inc., Newtown Square, Pennsylvania.
Competing interests
The authors have no competing interests.
Open Access Policy
This article is distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution, and reproduction in any medium, provided you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license, and indicate if changes were made.
Copyright
The authors have no competing interests.
|
|
|
ISSN (Online): 2040-7467
ISSN (Print): 2040-7459 |
|
Information |
|
|
|
Sales & Services |
|
|
|