Research Article | OPEN ACCESS
Study on the Evaluation Scope of Resource Reserves for Underground Mining Overlaid by Construction Project
Bing Han and Qiang Fu
China National Institute of Standardization, Beijing, 100088, China
Research Journal of Applied Sciences, Engineering and Technology 2016 12:907-912
Received: September 28, 2016 | Accepted: December 12, 2016 | Published: December 15, 2016
Abstract
The aim of this study is to propose a method for determining the evaluation scope of mineral resources overlaid by construction projects. The determination principles for evaluation scope of underground mine overlaid by the construction project are introduced, the vertical section method is employed to design the boundaries of safety pillars based on the mine displacement angles which represent the allowable values of surface deformation and the evaluation scope of underground mine overlaid by the planar engineering and linear engineering are analyzed through cases. The research results can provide references for route optimization of project or mining right compensation.
Keywords:
Construction project , evaluation scope , occupied mineral , resource reserves , underground mining,
References
-
Gao, Z.Q. and W.M. Gao, 2015. Influence factors of construction projects constructed over mineral resources. Resour. Environ. Eng., 29(4): 499-502.
-
Jin, L.S. and J.S. Mu, 2000. Specifications for Coal Pillar Preservation and Compressed Coal Mining for Buildings, Water Bodies, Railways and Main Shafts. China Coal Industry Publishing House, Beijing.
-
Li, Z.X., W. Xu, N. Peng, S.Y. Luo and J.B. Qi, 2014. Study on reserve estimation of the overlaid mineral resource—A case study on overlaid mineral resource on the Sanmenxia-Xichuan highway. Ground Water, 36(3): 148-160.
Direct Link
-
Liu, D.H., Y.Q. Xing and D.D. Zhai, 2010. Study on technical methods of mineral resources reserves below constructed projects-taking the main channel of middle line of south-to-north water transfer project for example. Henan Sci., 28(9): 1182-1188.
-
Ma, X.G., 2008. The method of map the mineral resources reserve zone below constructed projects. Xinjiang Geol., 26(2): 212-213.
-
Wang, W.D. and Y.P. Li, 2014. Error and correction of coal resources/reserves estimation by geological block methods. Coal Geol. Explor., 42(5): 1-3.
CrossRef
-
Xu, P., X.M. Wang and Z.W. Song, 2013. Main calculating points of reserves for overlaid mineral resources and the program design. Min. Res. Dev., 33(1): 106-109.
-
Yue, X.B., Z.P. Shuai and J.X. Wang, 2013. Discussion of estimation method of mineral resources below construction projects. Yangtze River, 44(6): 44-46.
-
Zhang, S.H., 2012. Discussion on investigation and evaluation method for mineral resource below constructed projects. Resour. Environ. Eng., 26(3): 278-280.
-
Zhang, S.H., 2014. Application of displacement angle in assessment of mineral resources below constructed projects. Resour. Environ. Eng., 28(3): 326-331.
-
Zhang, W.J. and S.D. Lan, 2014. Sensitivity analysis of mining economic parameters of overlaid mineral resources. Gold, 9(5): 35-39.
Competing interests
The authors have no competing interests.
Open Access Policy
This article is distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution, and reproduction in any medium, provided you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license, and indicate if changes were made.
Copyright
The authors have no competing interests.
|
|
|
ISSN (Online): 2040-7467
ISSN (Print): 2040-7459 |
|
Information |
|
|
|
Sales & Services |
|
|
|