Home            Contact us            FAQs
    
      Journal Home      |      Aim & Scope     |     Author(s) Information      |      Editorial Board      |      MSP Download Statistics

     Research Journal of Applied Sciences, Engineering and Technology


Research on the Safe Operation of Natural Gas Pipeline Network Based on an Improved Multi-Objective Comprehensive Evaluation Method

1Jing-Ya Dong, 2Hong-Yu Ren, 2Li Zhang, 3Yuan-Yuan Li and 2Yang Yang
1School of Engineering, Southwest Petroleum University, Nanchong 637001
2PetroChina Southwest Pipeline Company, Chengdu 610000
3Oil and Gas Storage and Transportation Company, Xinjiang Oilfield, Karamay 834000, China
Research Journal of Applied Sciences, Engineering and Technology  2018  1:16-23
http://dx.doi.org/10.19026/rjaset.15.5287  |  © The Author(s) 2018
Received: July 2, 2017  |  Accepted: August 22, 2017  |  Published: January 15, 2018

Abstract

The climate change, industrial production and other factors will affect the safety and steady operation of natural gas pipeline network in some cold areas. The aim of this study is to evaluate the operation scheduling schemes for the pipeline network. To this end, the effect of temperature change, pipeline pressure drop, transportation volume and gas storage capacity in the end section on the safety operation of natural gas pipeline network were comprehensively considered and then a multi-objective comprehensive evaluation model was established. In the presented model, for the sake of obtaining the operation schemes which satisfy the practical requirements, the TGNET software was adopted to build the natural gas pipe network simulation model; the Aspen HYSYS software was used to calculate the moisture content and provide the input data for the comprehensive evaluation model; the improved Analytic Hierarchy Process was utilized to establish the judgment matrix; the Grey Correlation method was selected to calculate the comprehensive correlation degree. Finally, the conclusion can be drawn that the multi-objective comprehensive evaluation method can be applied well to the decision on the natural gas pipeline network operation schemes for the cold area, so as to provide a reference approach for the future natural gas pipe network optimal operation.

Keywords:

Comprehensive evaluation method, decision scheme, multi-objective, natural gas pipeline network, safe operation, temperature change,


References

  1. Ai, M.Y., Y. Jiang, F. Song, G.Q. Chen and J.G. Song, 2011. Research on operation optimization of multi-objective decision making for large-scale gas pipeline network. Oil Gas Storage Transport., 30(10): 739-742.
  2. Cai, B.S., 2014. Research and application of a gas pipeline peak shaving project evaluation system (GPPES). Nat. Gas Ind., 34(10): 87-91.
  3. GB 22634-2008, 2008. Conversion Between Natural Gas Water Content and Water Dew Point. Standardization Administration of China.
  4. He, S., A.M. Ji and D.S. Chen, 2011. Application of fuzzy comprehensive evaluation in of security management assessment oil-drilling group. J. Safety Sci. Technol., 7(6): 156-161.
  5. Li, L.G., Z.H. Zhang, Y.S. Dai, W.F. Sun and C.Q. Dong, 2012. Operation optimization based on improved pattern search algorithm in gas transmission networks. J. China Univ., Petrol. Edn. Nat. Sci., 36(4): 139-143.
  6. Li, M.J., G.H. Chen and Y.T. Chen, 2004. Study on target standardization method of comprehensive evaluation. Chinese J. Manage. Sci., 12(s1): 45-48.
  7. Liu, Q., 2014. Research on natural gas pipeline scheduling optimization. M.Sc. Thesis, Southwest Petroleum University.
  8. Liu, S.F., Y.J. Yang and L.F. Wu, 2014. Grey System Theory and Its Application. 7th Edn., Science Press, Beijing.
  9. Liu, W., P. Zhang and Y. Liu, 2009. Decision of optimal scheduling scheme for gas pipeline network. J. Southwest Petrol. Univ., Sci. Technol. Edn., 31(3): 146-149.
  10. Yang, Y., 2006. Evaluation method on empowerment in multi-index comprehensive. Stat. Decis., 13: 17-19.
  11. Yao, A.L., Z.G. Zhao and J.W. Zhang, 2013. Quality evaluation for oil and gas pipeline risk assessment. Nat. Gas Ind., 33(12): 111-116.
  12. Zhu, K.J., L.L. Li and C.Z. Gong, 2012. Multi-objective optimizing model of time-of-use principle for natural gas industry customer. J. Beijing Inst. Technol. Soc. Sci. Edn., 14(1): 9-14.

Competing interests

The authors have no competing interests.

Open Access Policy

This article is distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution, and reproduction in any medium, provided you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license, and indicate if changes were made.

Copyright

The authors have no competing interests.

ISSN (Online):  2040-7467
ISSN (Print):   2040-7459
Submit Manuscript
   Information
   Sales & Services
Home   |  Contact us   |  About us   |  Privacy Policy
Copyright © 2024. MAXWELL Scientific Publication Corp., All rights reserved