Research on Construction Monitoring Techniques for Cable Replacement of the Cable-Stayed Bridge
Dai Pu and Tang Jishun
School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031, China
Research Journal of Applied Sciences, Engineering and Technology 2013 17:3202-3208
Received: January 15, 2013 | Accepted: February 07, 2013 | Published: September 20, 2013
Abstract
Due to various reasons, some cable-stayed bridges require the replacement of part or all stay cables after operating for a period of time. In this study, based on some engineering practices of stay cable replacement, the condition of bridge structure before replacement is analyzed with Finite Element Analysis method for plane member system. The theoretical calculations, cable force measurement, replacement methods and process monitoring for cable replacement are introduced to find out the key technical problems. From the specified bridge monitoring practices, we suggest monitoring cable tension and the main beam alignment during the process of cable replacement, to make sure the cable-stayed bridge reaches its design conditions.
Keywords:
Cable-stayed Bridge, cable tension measurement, construction monitoring, cable replacement, finite element analysis,
Competing interests
The authors have no competing interests.
Open Access Policy
This article is distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution, and reproduction in any medium, provided you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license, and indicate if changes were made.
Copyright
The authors have no competing interests.
|
|
|
ISSN (Online): 2040-7467
ISSN (Print): 2040-7459 |
|
Information |
|
|
|
Sales & Services |
|
|
|