Critical Success Factors for Implementing Lean Manufacturing in Malaysian Automotive Industry

1, 2A.N.M. Rose, 1B.M. Deros and 1M.N.A. Rahman
1Department of Mechanical and Materials Engineering, Faculty of Engineering and Built Environment, Universiti Kebangsaan Malaysia, 43600, Bangi, Malaysia
2Faculty of Mechanical Engineering, Universiti Malaysia Pahang, 26600, Pekan, Malaysia
Research Journal of Applied Sciences, Engineering and Technology  2014  10:1191-1200
http://dx.doi.org/10.19026/rjaset.8.1084  |  © The Author(s) 2014
Received: March ‎08, ‎2014  |  Accepted: April ‎11, ‎2014  |  Published: September 15, 2014

Abstract

The challenges faced by automotive manufacturers had made them looked into Lean Manufacturing (LM) which was implemented by Toyota Motor a long time ago. In Malaysia, the two main car manufacturers are PROTON and PERODUA; these two manufacturers offer good opportunity to large local companies and Small Medium Enterprises (SMEs) to participate in the automotive component manufacturing industry. The main objective of this study is to explore and investigate the level of perceptions on the importance and extent of practice with respect to 13 Critical Success Factors (CSFs) for LM implementation. To perform this study, a survey instrument that consists of 13 CSFs and 78 items was developed and distributed to local companies. The comparison was carried out on each of these CSFs based on perception, number of years and company size. The statistical analysis using the Kruskal Wallis test had identified four basic critical success factors for both SMEs and large companies with respect to the perception on the importance and extent of practice. Further study probes into the outcomes of the exploration on feasible LM practices.

Keywords:

Comparison , CSF , perception , Small and Medium Enterprises (SMEs) , survey,


References

  1. Abdullah, M.M., 2006. An empirical study of critical soft factors for quality improvement in the electrical and electronics firms in Malaysia. J. Siasat Bisnis, 11(3): 203-215.
    CrossRef    
  2. Achanga, P., E. Shehab, R. Roy and G. Nelder, 2006. Critical success factors for lean implementation within SMEs. J. Manuf. Technol. Manage., 11(4): 460-471.
    CrossRef    
  3. Ahrens, T., 2006. Lean Production: Successful Implementation of Organisational Change in Operations Instead of Short Term Cost Reduction Efforts. Lean Alliance.
    Direct Link
  4. Antony, J., K. Leung and G. Knowles, 2002. Critical success factors of TQM implementation in Hong Kong industries. Int. J. Qual. Reliab. Manage., 19(5): 551-566.
    CrossRef    
  5. Bhasin, S. and P. Burcher, 2006. Lean viewed as a philosophy. J. Manuf. Technol. Manage., 17(1): 56-72.
    CrossRef    
  6. Brun, A., 2010. Critical success factors of Six Sigma implementations in Italian companies. Int. J. Prod. Econ., 13(1): 158-164.
    CrossRef    
  7. Chang, D. and S.M. Lee, 1996. The impact of critical success factors of JIT implementation on organizational performance. Prod. Plan. Control, 7(3): 329-338.
    CrossRef    
  8. Chavez, R., R. Chavez, C. Gimenez, B. Fynes, F. Wiengarten and W. Yu, 2013. Internal lean practices and operational performance: The contingency perspective of industry clockspeed. Int. J. Oper. Prod. Man., 33(5): 562-588.
    CrossRef    
  9. Coronado, R.B. and J. Antony, 2002. Success factors for the implementation of six sigma projects. TQM Mag., 14(2): 92-99.
    CrossRef    
  10. Deros, B.M., S.M. Yusof and A.M. Salleh, 2006. A survey on critical factors and problems in implementing benchmarking towards achieving business competitiveness in SMEs. J. Kejuruteraan, 18: 29-37.
  11. Dillsman, D.A., 1978. Mail and Telephone Surveys: The Total Design Method. Wiley, New York.
  12. Farris, J.A., E.M.V. Aken, T.L. Doolen and J. Worley, 2009. Critical success factors for human resource outcomes in Kaizen events: An empirical study. Int. J. Prod. Econ., 20(117): 42-65.
    CrossRef    
  13. Ferdousi, F. and A. Ahmed, 2009. An investigation of manufacturing performance improvement through lean production: A study on Bangladeshi garment firms. Int. J. Bus. Manage., 4(9): 106-114.
    CrossRef    
  14. Finch, B., 1986. Japanese management techniques in small manufacturing companies: A strategy for implementation. Prod. Inventory Manage., 27(3): 30-38.
  15. Flynn, B.B., R.G. Schroeder and S. Sakakibara, 1994. A framework for quality management research and an associated measurement instrument. J. Oper. Manag., 11(4): 339-366.
    CrossRef    
  16. Fullerton, R.R. and C.S. McWatters, 2001. The production performance benefits from JIT implementation. J. Oper. Manag., 19(1): 81-96.
    CrossRef    
  17. Fullerton, R.R., C.S. McWatters and C. Fawson, 2003. An examination of the relationships between JIT and financial performance. J. Oper. Manag., 21: 383-404.
    CrossRef    
  18. Ghosh, M., 2013. Lean manufacturing performance in Indian manufacturing plants. J. Manuf. Tech. Manage., 24(1): 113-122.
    CrossRef    
  19. Heizer, J. and B. Render, 2006. Operations Management. 8th Edn., Pearson Prentice Hall, New Jersey.
    PMCid:PMC1885142    
  20. Jayaraman, K. and T.L. Kee, 2012. The perceptions and perspectives of Lean Six Sigma (LSS) practitioners: An empirical study in Malaysia. TQM J., 24(5), 433-446.
    CrossRef    
  21. Kumar, M. and A. Antony, 2008. Comparing the quality management practices in UK SMEs. Ind. Manage. Data Syst., 108(9): 1153-1166.
    CrossRef    
  22. Lee, C.Y., 2004. TQM in small manufacturers: An exploratory study in China. Int. J. Qual. Reliab. Manage., 21(2): 175-197.
    CrossRef    
  23. Motwani, J., 2003. A business process change framework for examining lean manufacturing: A case study. Ind. Manage. Data Syst., 103(5): 339-346.
    CrossRef    
  24. Palaniappan, A.K., 2009. Penyelidikan dan SPSS (PASW). Pearson-Prentice Hall, Kuala Lumpur, Malaysia.
  25. Pallant, J., 2007. SPSS Survival Manual: A Step by Step Guide to Data Analysis using SPSS for Windows. 3rd Edn., McGraw-Hill, New York.
    PMCid:PMC1950699    
  26. Papadopoulu, T.C. and M. Ozbayrak, 2005. Leanness: Experiences from the journey to date. J. Manuf. Tech. Manage., 16(7): 784-806.
    CrossRef    
  27. Ravikumar, M.M., K. Marimuthu and H. AbdulZubar, 2014. Critical success factors and obstacles of lean implementation in micro, small and medium enterprises. Aust. J. Basic Appl. Sci., 8(3): 549-553.
  28. Real, R., M. Pralus, M. Pillet and L. Guizzi, 2007. A study of supporting programs for small and medium enterprises: A first stage going to "Lean". Proceeding of IEEE International Conference on Industrial Engineering and Engineering Management, pp: 515-519.
    CrossRef    
  29. Rineheart, J., C. Huxley and D. Robertson, 1997. Just another Car Factory? Lean Production and its Contents. Cornell University Press, Ithaca, NY.
  30. Rokart, J., 1979. Chief executives define their own data needs. Harvard Bus. Rev., 57(2): 81-93.
  31. Rose, A.N.M., B.M. Deros and M.N. Ab. Rahman, 2013. A study on lean manufacturing implementation in Malaysian automotive component industry. Int. J. Automot. Mech. Eng., 8: 1467-1476.
    CrossRef    
  32. Sakakibara, S., B.B. Flynn and R.G. Schroder, 1993. A framework and measurement instrument for just in time manufacturing. Prod. Oper. Manag., 2(3): 177-194.
    CrossRef    
  33. Saleheldin, S.I., 2005. JIT implementation in Egyptian manufacturing firms: Some empirical evidence. Int. J. Oper. Prod. Man., 25(4): 354-370.
    CrossRef    
  34. Saleheldin, S.I., 2009. Critical success factors for TQM implementation and their impact on performance of SMEs. Int. J. Prod. Performance Manage., 58(3): 215-237.
    CrossRef    
  35. Sanchez, A.M. and P. Perez, 2001. Lean indicators and manufacturing strategies. Int. J. Oper. Prod. Man., 21(11): 1433-1452.
    CrossRef    
  36. Saraph, J.V., P.G. Benson and R.G. Schroeder, 1989. An instrument for measuring the critical success factors of quality management. Decision Sci., 20(4): 810-829.
    CrossRef    
  37. Shah, R. and P.T. Ward, 2007. Defining and developing measures of lean production. J. Oper. Manag., 25(4): 785-805.
    CrossRef    
  38. SME Corp., 2010. Malaysia. Retrieved from: http://www.smecorp.gov.my/node/33 (Accessed on: Jan 25, 2010).
    Direct Link
  39. Tabachnick, B.G. and L.S. Fidell, 2001. Using Multivariate Statistics. 4th Edn., Harper Collins, New York.
    PMid:16705786    
  40. Womack, J., D.T. Jones and D. Roos, 1990. The Machine that Changed the World. Rawson Associates, New York.
  41. Wong, Y.C., K.Y. Wong and A. Ali, 2009. A study on lean manufacturing implementation in the Malaysia electrical and electronics industry. Eur. J. Sci. Res., 38(4): 521-535.
  42. Worley, J.M. and T.L. Doolen, 2006. The role of communication and management support in a lean manufacturing implementation. Manage. Decis., 44(2): 228-245.
    CrossRef    
  43. Yang, P.A. and Y.B. Yu, 2010. The barriers to SMEs' implementation of lean production and countermeasures-based on SMS in Wenzhou. Int. J. Innov. Manage. Tech., 1(2): 221-225.
  44. Yasin, M.M., M. Wafa and M.H. Small, 2004. Benchmarking JIT: An analysis of JIT implementations in the manufacturing service and public sectors. Benchmarking: Int. J., 11(1): 74-92.
    CrossRef    
  45. Yauch, C.A. and H.J. Steudel, 2002. Cellular manufacturing for small businesses: Key cultural factors that impact the conversion process. J. Oper. Manag., 20(5): 593-617.
    CrossRef    
  46. Yusof, S.M. and E.M. Aspinwall, 2000. Critical success factors in small and medium enterprises: Survey results. Total Qual. Manage., 11(6): 448-462.
    CrossRef    
  47. Zadry, H.R. and S.M. Yusof, 2006. Total quality management and theory of constraints implementation in Malaysian automotive suppliers: A survey result. Total Qual. Manag. Bus., 17(8): 999-1020.
    CrossRef    

Competing interests

The authors have no competing interests.

Open Access Policy

This article is distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution, and reproduction in any medium, provided you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license, and indicate if changes were made.

Copyright

The authors have no competing interests.

ISSN (Online):  2040-7467
ISSN (Print):   2040-7459
Submit Manuscript
   Information
   Sales & Services
Home   |  Contact us   |  About us   |  Privacy Policy
Copyright © 2024. MAXWELL Scientific Publication Corp., All rights reserved